Construction Materials in Dehradun

Construction Materials in Dehradun

Construction materials in Dehradun have evolved significantly over the so many years, we offering homeowners a wide range of high-quality and durability options for building strong, long-lasting homes with modern designs. from premium-grade cement, steel and river sand to modern materials like AAC blocks, ready mix concrete and advanced waterproofing solutions, where the city provides everything needed from reliable constructions. Local suppliers ensure easy availability, competitive pricing, and timely delivery across growing residential areas across Dehradun. with increasing demand for modern architecture and sustainable building, many builders now prefer eco-friendly materials and lot’s of fly-ash bricks, solar roofing systems, and energy-efficient insulation. whether you are build your favorite newly home or customer home designs or renovating and existing one the.

Construction Materials in Dehradun WORK DETAILS

RATE 1800/- PER SQFT (Rate very as per requirement)

Trusted Dehradun Builders
Build Your Dream Project in Dehradun

Get premium construction services with 100% transparency, MDDA approved maps, and earthquake-resistant engineering.

CIVIL WORK:

  • Excavation work to begin by clearing the plot and preparing temporary hutments for on-site labor.
  • Foundation and House Construction Contractors in Dehradun includes columns and brick base work for initial structural stability.
  • Column dimensions will be maintained at 9″ × 14″, reinforced with 4 bars of 16 mm and 2 bars of 12 mm steel.
  • Brick masonry to be constructed up to 2 ft 6 inches in height.
  • RCC roof slab to be cast with high-strength concrete for long-term durability.
  • Plinth beam size fixed at 9″ × 12″, reinforced with 6 bars of 12 mm steel.
  • All RCC components—including walls, footings, columns, beams, stairs, slabs, and underground tanks—will be constructed using M20/M25 grade concrete.
  • A 3 mm APP membrane will be torch-applied over the DPC layer placed on the plinth beam for complete waterproofing.
  • Ready-Mix Concrete (RMC) will not be used; all concrete will be mixed on-site for quality control.
  • Admixtures, specifically Dr. Fixit LW-100, will be added to all RCC mixes for enhanced waterproofing and strength.
  • Ply or steel shuttering with shuttering oil will be used for columns, slabs, beams, and fascias.
  • Steel grade used will be 500 N/mm², preferably Tehri Gold steel.
  • Only washed Paonta bajri and crusher sand will be used for all RCC work.
  • Cement grouting will be done in a 1:6 mix with LW-100 for added bonding and waterproofing.
  • Concrete mixers and vibrators will be deployed throughout the construction to ensure proper compaction.
  • Mud-filling inside rooms will be done up to plinth level, ensuring no debris or organic material is mixed in.
  • Plinth height will be maintained between 3″ to 6″ above the highest point of the adjacent road.
  • Cement brands approved for use include Ultratech, ACC, and Ambuja.
  • Anti-termite treatment will be carried out in three stages—foundation, flooring, and apron.
  • Minimum clear floor height for each level will be kept at 11 feet, ensuring proper ventilation.
  • DPC layer, 2 inches thick (1:5 cement-sand with waterproofing compound), will be installed with a 3 mm APP membrane below it for complete damp protection.
  • Toilet floors will be lowered (sunken) to allow space for sanitary pipe installations.Excavation work to begin by clearing the plot and preparing temporary hutments for on-site labor.
  • Foundation construction includes columns and brick base work for initial structural stability.
  • Column dimensions will be maintained at 9″ × 14″, reinforced with 4 bars of 16 mm and 2 bars of 12 mm steel.
  • Brick masonry to be constructed up to 2 ft 6 inches in height.
  • RCC roof slab to be cast with high-strength concrete for long-term durability.
  • Plinth beam size fixed at 9″ × 12″, reinforced with 6 bars of 12 mm steel.
  • All RCC components—including walls, footings, columns, beams, stairs, slabs, and underground tanks—will be constructed using M20/M25 grade concrete.
  • A 3 mm APP membrane will be torch-applied over the DPC layer placed on the plinth beam for complete waterproofing.
  • Ready-Mix Concrete (RMC) will not be used; all concrete will be mixed on-site for quality control.
  • Admixtures, specifically Dr. Fixit LW-100, will be added to all RCC mixes for enhanced waterproofing and strength.
  • Ply or steel shuttering with shuttering oil will be used for columns, slabs, beams, and fascias.
  • Steel grade used will be 500 N/mm², preferably Tehri Gold steel.
  • Only washed Paonta bajri and crusher sand will be used for all RCC work.
  • Cement grouting will be done in a 1:6 mix with LW-100 for added bonding and waterproofing.
  • Concrete mixers and vibrators will be deployed throughout the construction materials in Dehradun to ensure proper compaction.
  • Mud-filling inside rooms will be done up to plinth level, ensuring no debris or organic material is mixed in.
  • Plinth height will be maintained between 3″ to 6″ above the highest point of the adjacent road.
  • Cement brands approved for use include Ultratech, ACC, and Ambuja.
  • Anti-termite treatment will be carried out in three stages—foundation, flooring, and apron.
  • Minimum clear floor height for each level will be kept at 11 feet, ensuring proper ventilation.
  • DPC layer, 2 inches thick (1:5 cement-sand with waterproofing compound), will be installed with a 3 mm APP membrane below it for complete damp protection.
  • Toilet floors will be lowered (sunken) to allow space for sanitary pipe installations.

BRICK WORK:

  • All exterior walls will be constructed with 230 mm (9-inch) thickness for maximum strength and durability.
  • 230 mm brick masonry will use first-class bricks laid in a 1:6 cement–sand ratio, ensuring solid structural bonding.
  • Internal partition walls, with a thickness of 115 mm, will be built using first-class brickwork in a 1:4 cement–sand mix for added stability.
  • Door and window frames will be fixed during the brickwork process, secured with a minimum of three holdfasts or anchors for firm support.
  • Corbels or wall offsets will be constructed wherever necessary according to structural design.
  • Wall niches will be incorporated as shown in the architectural drawings for utility or decorative purposes.

PLASTERING (INTERNAL AND EXTERNAL):

  • All walls, beams, roofs, and brickwork will receive plastering using a 1:6 cement–sand mix for a smooth, durable finish.
  • A wire mesh will be installed at every brickwork and RCC junction to prevent future cracks and ensure long-term stability.
  • Internal and external ceilings, beams, and edges will be finished with plain plaster in a 1:4 mix (cement:fine sand), while wall surfaces will be plastered in a 1:5 ratio. Waterproofing additives will be included in critical zones for extra protection.
  • Rough plastering will be carried out in areas designated for tile installation to ensure proper grip and bonding.
  • External plaster on the front elevation will include architectural designs or texturing as specified in the provided drawings.
  • RCC slabs will be cast wherever necessary, such as stores, wardrobes (almirah areas), and other structural provisions.
  • Before plastering, two coats of Dr. Fixit Pidifin 2K will be applied up to 4 feet height on all internal and external walls for enhanced damp-proofing and moisture protection.

DOOR LEVEL:

RCC lintel beams will be installed over all door and window openings as indicated in the drawings. Sunshades measuring 2′-6″ in width and 3 inches in thickness will be provided at a height of 7′-0″ on both the ground and first floors, wherever specified in the architectural plans.

ROOF SLAB LEVEL:

  • The RCC slab will have a minimum thickness of 5 inches, or as specified in the structural drawings, and will be cast using steel plate shuttering for a smooth finish.
  • The RCC mix will follow the designated M20/M25 grade, with reinforcement steel placed exactly as per the approved drawings.
  • Concrete mixers and vibrators will be used throughout the casting process to ensure proper compaction and strength.
  • Khaska gola/corbelling will be provided below the roof slab and sunshades on the front elevation in accordance with the architectural design.
  • Ply or steel plate shuttering will be used for all RCC works to maintain accurate dimensions and surface quality.
  • RCC slabs will also be constructed in the store room and wherever else required as per the plan.
  • In the utility area, RCC slabs will be provided for the washing machine platform, with overhead RCC shelves accompanied by shutter covers for organized storage.
  • Additional RCC shelves will be built in the store room for durable and long-lasting storage solutions.

FLOORING/TILING:

  • The RCC slab will be constructed with a minimum thickness of 5 inches, or as outlined in the structural drawings, using steel plate shuttering for a precise finish.
  • The concrete will be prepared in M20/M25 grade, and all reinforcement steel will be placed exactly as detailed in the approved structural plans.
  • Concrete mixers and vibrators will be used during casting to ensure proper compaction, strength, and durability.
  • Khaska gola/corbelling beneath the roof slab and sunshades on the front elevation will be executed as per the architectural drawings.
  • Ply or steel plate shuttering will be utilized for all RCC components to maintain high-quality surface and accurate dimensions.
  • Additional RCC slabs will be provided in the store room and in any other area specified in the drawings.
  • In the utility section, dedicated RCC platforms will be created for the washing machine setup, along with RCC shelves above, complete with covers for secure storage.
  • The store room will also include built-in RCC shelves, offering strong, durable, and long-lasting storage solutions.

APRON/EXTERNAL STEPS:

  • A 2′-6″ wide apron will be constructed around the entire building after completing the full perimeter anti-termite treatment. Additionally, steps or a ramp leading to the ground floor will be provided wherever indicated in the architectural drawings.

SANITARY WORK:

A) OVER-HEAD WATER TANKS:

  • Overhead water tanks of 500 liters capacity, made of food-grade material in white or black color (Sintex brand), will be installed on a pre-fabricated MS platform for safe and durable water storage.

B) EXTERNAL SANITARY WORK:

  • All manholes will be interconnected using PVC piping, with the entire drainage line designed to flow and discharge into the final/terminal manhole.

C) INTERNAL FITTING:

  • CPVC piping will be used throughout the plumbing system, with Astral as the preferred brand.
  • SWP, WWP, and RWP lines will be installed using high-quality Supreme brand pipes for long-lasting performance.
  • Diverters will be fitted in every washroom for both basin and shower areas to ensure smooth water control.
  • Complete geyser points will be provided wherever required.
  • Additional plumbing provisions will be made for laundry machines, dishwashers, and other utility appliances.

D) RAIN WATER HARVESTING:

  • All rainwater downpipes will be connected to the underground drainage system and manholes, and the collected water will be directed into a rainwater harvesting tank of approximately 5000 liters, routed first through a de-silting chamber for filtration. Any excess water beyond tank capacity will be automatically diverted to the ground recharge pit for sustainable water replenishment.

E) CHINAWARE (COST NOT LESS THAN RS. 25,000/- BATHROOM FOR CHINA WARE AND FAUCETS):

  • Wall-hung WC units will be installed, complete with a seat cover, jet spray, and health faucet for enhanced hygiene and convenience.
  • In-wall concealed cisterns and hot–cold diverter mixers will be provided for all WC setups.
  • Under-counter wash basins will be used for a clean and modern finish.
  • The wash basin countertop will be crafted from granite, priced at approximately ₹170 per sq. ft.
  • Vanity units will be installed in the basin areas to offer organized and functional storage space.

F) FAUCETS:

  • Diverters will be installed in the bathing area for smooth control of hot and cold water flow.
  • A wall-mounted diverter will be provided at each wash basin for efficient water mixing.
  • An overhead shower will be fitted to enhance the bathing experience.
  • Complete provisions for geysers will be included in all required locations.

G)BATHING AREA:

The bathing area will include a 2-inch high granite ledge for proper water separation, and the flooring will be finished with anti-skid tiles to ensure safety and slip resistance.

KITCHEN WORK:

  • A modular kitchen will be installed within a budget of ₹1,00,000, inclusive of fittings and fixtures.
  • All civil construction companies in Dehradun work will be completed, and the kitchen counter will feature a granite top costing not less than ₹170 per sq. ft.
  • Glazed vitrified tiles will be laid up to 2 ft above the counter, while standard white tiles will be placed behind the cabinets (approx. ₹40/-).
  • The sink will be a Nirali stainless steel double-bowl model with a single drainboard, priced around ₹3,500.
  • Kohler-brand faucets will be used for high durability and performance.
  • A Kohler mixer will be installed, offering one freshwater outlet and one hot–cold mixing outlet (approx. ₹2,200).
  • Provision for a geyser will be included for hot water availability.
  • The kitchen flooring will be finished with anti-skid vitrified tiles for enhanced safety.
  • Required provisions for chimney and exhaust fan installation will be incorporated.
  • All electrical points will be placed according to the layout provided by the modular kitchen agency.

SHUTTERS:

  • Doors will be constructed using 35/30 mm thick flush shutters, finished with 4 mm teak ply as per the approved designs.
  • All door shutters will feature a premium wood-finish look for an elegant and durable appearance.

WINDOWS / SLIDERS:

  • Aluminum or UPVC windows and doors will be installed from premium brands such as Schueco, Tostem, or Fenesta.

PAINTING/POLISHING (External):

  • All plastered surfaces will be finished with two coats of Apex Ultima applied over a base of one coat of Snowcem and a primer layer, ensuring long-lasting protection and a premium finish.

PAINTING/POLISHING (Internal):

  • The living area and lobby will be finished with Asian Paints Oil Bond paint, applied over two coats of Birla putty for a smooth, premium surface.
  • All other interior spaces will receive oil-bound distemper, also applied over a double coat of Birla putty, ensuring an even and long-lasting finish.

Grill/Gate:

  • All metal components will be finished with two coats of enamel paint applied over a high-quality primer for long-lasting protection.
  • All paints specified above will be sourced exclusively from Asian Paints.

ELECTRICAL WORK:

  • Polycab modular switches will be used for all electrical fittings.
  • Electrical installation will include copper multistrand wiring laid in concealed PVC conduits, all sourced from Polycab, ensuring safety and durability.
  • Adequate lighting points, power sockets, and switch provisions will be made throughout the house as per the approved layout.
  • Chemical copper earthing will be provided wherever required for complete electrical safety.
  • TV points will be installed in every bedroom, as well as the drawing and dining areas.
  • All wiring will be of FRLS grade (Fire Retardant Low Smoke)—Brand: Polycab.
  • A Havells double-door distribution board with high-quality MCBs will be used.
  • Exhaust fan provisions will be made in all toilets and in the kitchen.
  • Inverter wiring will be integrated to support backup power.
  • Provisions will be included for outdoor security lighting.
  • Split AC points (hot & cold all-weather models) will be provided, along with proper locations for both indoor and outdoor units, including electrical supply lines.
  • Wi-Fi/LAN provisions will be incorporated for seamless internet connectivity.
  • Geyser points will be installed in all washrooms, the kitchen, and the utility area.
  • A dedicated RO provision will be provided in the kitchen.

PAYMENT SCHEDULE:

  • Advance Payment – 5%
  • Post Column Digging – 10%
  • For Steel Reinforcement in Columns – 10%
  • At Plinth Beam Level – 10%
  • Brickwork Stage – 5%
  • Door Frames (Chaukhat) & Window Installation – Approximately 5%
  • Column & Brickwork Completion up to Roof Level – 5%
  • After Roof Casting – 15%
  • Electrical & Sanitary Pipe Installation – 5%
  • External Plaster Work – 2%
  • Internal Plaster Work – 5%
  • Wall Putty Work – 3%
  • Flooring / Wall Tiles / Stone Work – 10%
  • Electrical Wiring – 2%
  • Sanitary Fittings & Fixtures – 5%
  • Final Completion Stage – 3%
  • Additional Guarantee
  • A 10-year roof seepage warranty will be provided upon completion.

2 thoughts on “Construction Materials in Dehradun”

  1. Hi iam form Mothrowala.. This blog cleared many doubts regarding home construction costs. Planning to contact Ghughuti Infra for a site visit soon.

  2. Very informative blog. The explanation about construction quality and rates in Dehradun is clear and practical. Ghughuti Infra really maintains transparency in their work.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
×
Call Now WhatsApp Chat Site FooterSite Footer